-
B.C. North Coast tanker ban to remain in place after Liberals vote down Tory bill
Source: CBC Politics
Date: 2026-10-28 22:56:24.0
Tags: [National, British Columbia, Alberta, Energy, Resources, Transportation]The federal Liberal government voted down Conservative Bill C-264 in the House of Commons, maintaining the Oil Tanker Moratorium Act that prohibits crude oil tankers carrying more than 12,500 metric tonnes along British Columbia's North Coast. The defeated private-member bill aimed to repeal the tanker ban to support a private-sector proposal by Calgary-based Strathcona Resources to ship up to 250,000 barrels of Canadian oil daily via rail through Prince Rupert, B.C. Prime Minister Mark Carney's federal government and the British Columbia government previously struck a deal to keep the ban in place, routing a separate proposed pipeline project south to comply with the moratorium.
Read Original -
The owner of Ace Liquor and Spiritleaf raises its bet on U.S. cannabis, as its manufacturing arm faces a strategic review
Source: Alberta - Edmonton Journal (Legislature & Capital)
Date: 2026-10-28 11:00:16.0
Tags: [Alberta, British Columbia, Economy, Industry, Labour, Trade]Edmonton-based retailer SNDL Inc., owner of Ace Liquor, Value Buds, and Spiritleaf, is conducting a strategic review and weighing the potential sale of its unprofitable Canadian cannabis production assets while exiting the dried flower business. The company reported a $52-million write-down and a 28 per cent year-over-year sales drop in its weed production segment, alongside cutting its workforce at its Kelowna, British Columbia manufacturing facility by more than 30 per cent. Simultaneously, SNDL invested $60.8 million into the United States market, acquiring approximately a 92 per cent stake in a partnership controlling Parallel, an American cannabis grower and retailer operating over 50 locations across Florida, Texas, and Massachusetts.
Read Original -
Poilievre asks Carney to repeal B.C.’s oil tanker ban
Source: Global News Politics
Date: 2026-10-26 15:01:23.0
Tags: [National, British Columbia, Alberta, Energy, Resources, Trade]Conservative Leader Pierre Poilievre and several opposition MPs signed a letter urging Prime Minister Mark Carney to repeal the federal oil tanker ban on British Columbia's northern coast as a federal Tory bill goes to second reading. The proposed repeal aims to advance a project by Calgary-based Strathcona Resources to ship up to 250,000 barrels of Canadian oil per day via existing railroad tracks through Prince Rupert, B.C., across the Pacific Ocean. The push challenges an agreement signed in July by Prime Minister Mark Carney and former B.C. Premier David Eby committing Ottawa to maintain the north coast tanker ban without alteration.
Read Original -
Canada Post starting weekend parcel delivery in Toronto, Montreal and Ottawa this fall
Source: CBC Politics
Date: 2026-10-22 19:44:37.0
Tags: [National, Ontario, Quebec, British Columbia, Alberta, Labour, Transportation, Finance]Canada Post has launched weekend parcel delivery in Ottawa and Montreal, with plans to expand to Toronto in late November 2026 and to Vancouver, Edmonton, and Calgary the following year, aiming to reach seven million households by the end of 2027. The Crown corporation reported a pre-tax loss of $482 million in the first half of 2026 and continues to rely on federal loans, though parcel revenue grew by 20.7 percent year-over-year in the second quarter. This operational restructuring follows a month-long national strike in December 2024 and the signing of a new collective agreement with the Canadian Union of Postal Workers (CUPW) that remains in effect until 2030.
Read Original -
Métis leaders in oilsands region say they haven’t been consulted on proposed Pacific Link pipeline
Source: Territories - Northern Affairs (Yukon, NWT, Nunavut)
Date: 2026-10-15 12:00:00.0
Tags: [National, Alberta, British Columbia, Energy, Indigenous, Infrastructure]Métis leaders representing six communities in the Fort McMurray Wood Buffalo region have accused Prime Minister Mark Carney and the federal government of failing to consult them regarding the proposed Pacific Link pipeline. The proposed 1,000,000 barrel-per-day oil pipeline—designated as being in the national interest under the Building Canada Act—aims to connect Alberta's oilsands to a deepwater port near Delta, British Columbia, with approvals targeted for September 2027 and operations slated for 2032 or 2033. While the federal government has engaged First Nations leadership and announced a 10 per cent Indigenous ownership stake, local Métis presidents including Ruby Ladouceur of Fort Chipewyan Métis Nation and Stella Lavallee of Willow Lake Métis Nation expressed concerns over potential environmental impacts and the lack of inclusion in project discussions.
Read Original -
Provinces call on Ottawa to expand mining credit
Source: Global News Politics
Date: 2026-10-10 12:17:12.0
Tags: [National, British Columbia, Alberta, Saskatchewan, Manitoba, Nova Scotia, Taxation, Economy, Resources, Mining, Finance]Nearly half of Canada's provinces and territories—specifically Nova Scotia, Manitoba, Saskatchewan, Alberta, British Columbia, and Yukon—are urging the federal Liberal government to fulfill its 2025 election promise to expand the mineral exploration tax credit to include engineering and feasibility study costs. The Association for Mineral Exploration and the Nunavut and N.W.T. Chamber of Mines argue this measure is crucial to help junior mining companies navigate the late-stage 'valley of death' financing gap. An Ernst & Young report commissioned by the association indicates that covering feasibility and economic viability studies could generate between 14,000 and 34,000 jobs and add $5.2 billion to $12.2 billion in GDP over 10 years. While Finance Minister François-Philippe Champagne's office highlighted recent federal initiatives such as the Productivity Mega Deduction and the Critical Mineral Exploration Tax Credit, federal expenses under the Canadian exploration expenses framework still exclude economic assessments and feasibility studies.
Read Original -
Cold Lake First Nations seeking judicial review of Pacific Link pipeline designation
Source: CBC Politics
Date: 2026-10-08 19:37:43.0
Tags: [National, Alberta, British Columbia, Indigenous, Energy, Infrastructure]Cold Lake First Nations filed an application for judicial review in Federal Court challenging the federal government's decision to designate the Pacific Link pipeline as a project in the national interest under the Building Canada Act. Prime Minister Mark Carney and Alberta Premier Danielle Smith announced the fast-tracking of the West Coast oil pipeline project with the goal of completing reviews and consultations over the next year to begin construction by next September. Cold Lake First Nations Chief Kelsey Jacko stated that his community was excluded from consultations on the designation despite being situated in the oilsands region. The legal challenge argues that the designation breaches Canadian law, is inconsistent with the honour of the Crown, and fails to account for adverse effects on Treaty No. 6 rights and cumulative oilsands development impacts.
Read Original -
Water, toxic waste and opportunity: Indigenous leaders react to Carney's pipeline plan
Source: CBC Politics
Date: 2026-10-08 08:00:00.0
Tags: [National, British Columbia, Alberta, Energy, Environment, Indigenous]Prime Minister Mark Carney's federal government designated the Pacific Link pipeline project—designed to transport one million barrels of oil daily from Bruderheim, Alberta, to Roberts Bank, British Columbia—as a project in the national interest, targeting construction to begin within a year and operations by 2032. Indigenous leaders, including Sumas First Nation Chief Dalton Silver, Treaty 8 Grand Chief Trevor Mercredi, and Fort McKay First Nation Chief Raymond Powder, have raised critical concerns regarding tight consultation timelines, potential environmental threats to water, fish, and wildlife, unresolved oilsands tailings management, and equitable community equity participation offering at least 10 per cent ownership.
Read Original -
Indigenous, local leaders optimistic about new pipeline despite “host of issues” Carney says Federal government is yet to address
Source: Alberta - Edmonton Journal (Legislature & Capital)
Date: 2026-10-05 16:03:04.0
Tags: [National, Alberta, British Columbia, Energy, Infrastructure, Environment, Indigenous]Prime Minister Mark Carney, Alberta Premier Danielle Smith, and Pembina Pipeline Corp. CEO Scott Burrows announced that the Pacific Link Pipeline (formerly West Coast Oil Pipeline) has been officially listed as a project of national interest under the Building Canada Act. The project aims to export an additional one million barrels of Albertan oil per day to Asian markets, generate over $20 billion annually in GDP, create 140,000 jobs, and provide a 10 per cent ownership stake to Indigenous communities in British Columbia and Alberta through an accelerated single federal regulatory review process. However, the initiative faces ongoing concerns from local Indigenous groups—including Fort McKay First Nation, Mikisew Cree First Nation, and Athabasca Chipewyan First Nation—regarding unresolved legacy issues, carbon capture and storage technologies like the Pathways Project, mine water release, and effluents regulations tied to a trilateral memorandum of understanding aiming to double regional oil production to eight million barrels per day within a decade.
Read Original -
How a new oil pipeline could open new markets for Canada — and deepen U.S. ties
Source: Alberta - Edmonton Journal (Legislature & Capital)
Date: 2026-10-05 11:00:37.0
Tags: [National, Alberta, British Columbia, Energy, Infrastructure, Trade]Prime Minister Mark Carney and Alberta Premier Danielle Smith declared the 1,250-kilometer Pacific Link oil pipeline—running from Bruderheim, Alberta to Delta, British Columbia and adding one million barrels per day of capacity—a project of national interest. Co-owned equally by Ottawa and Alberta with at least 10 percent equity offered to Indigenous communities and led by Trans Mountain Corp. alongside private partner Pembina Pipeline Corporation, the project aims to reduce reliance on U.S. markets by opening Asian trade routes. However, industry analysts note the pipeline will exacerbate Western Canada's reliance on American condensate imports, requiring an additional 383,000 barrels per day of diluent to transport the heavy bitumen. Ottawa has targeted September 1, 2027, to finalize building conditions for the infrastructure.
Read Original -
Carney, Smith say new West Coast pipeline could get oil companies building again
Source: CBC Politics
Date: 2026-10-02 21:02:38.0
Tags: [National, Alberta, British Columbia, Infrastructure, Energy, Resources]Prime Minister Mark Carney announced that the proposed one-million-barrel-per-day Pacific Link oil pipeline from Alberta to a southern British Columbia tanker export terminal has been designated as a project of national interest under the Building Canada Act. The project, which largely follows the existing Trans Mountain corridor, will undergo a streamlined review process shepherded by the Calgary-based major projects office. Alberta Premier Danielle Smith and industry representatives note that the initiative—coupled with increased technological innovation, automated oilsands haul trucks, and early First Nations participation—aims to foster sustained growth and efficient labor-sharing among producers like Suncor Energy Inc. without repeating the cost inflation and labor shortages of past booms.
Read Original -
Another oilsands boom? Smith, Carney say this time Canada will be ready
Source: Global News Politics
Date: 2026-10-02 20:30:16.0
Tags: [National, Alberta, British Columbia, Energy, Resources, Infrastructure]Prime Minister Mark Carney and Alberta Premier Danielle Smith announced that the proposed million-barrel-per-day Pacific Link oil pipeline from Alberta to southern British Columbia has been designated as a project of national interest under legislation passed the previous year. The designation subjects the pipeline to a streamlined review process managed by the Calgary-based major projects office. While industry executives and officials anticipate sustained growth rather than a repeat of the historical mid-2000s boom, analysts highlight potential workforce challenges and the need to sequence major infrastructure projects to manage labour scarcity.
Read Original -
Separatist, environment, and some First Nation groups speak out against new Alberta-B.C. pipeline
Source: Alberta - Edmonton Journal (Legislature & Capital)
Date: 2026-10-02 20:03:56.0
Tags: [National, Alberta, British Columbia, Infrastructure, Energy, Environment, Indigenous]Prime Minister Mark Carney and Alberta Premier Danielle Smith announced that the Pacific Link pipeline, proposed by Pembina Pipeline Corporation, has been designated a project of national interest, allowing it to be fast-tracked through Ottawa's major projects office with construction potentially starting in September. The pipeline faces strong opposition from Alberta separatists like Let Alberta Decide over public financing and timing, B.C. and Alberta First Nations including Sturgeon Lake Cree Nation and the Union of B.C. Indigenous Chiefs over lack of consultation and environmental impacts, and environmental groups like the Pembina Institute and Ecojustice over increased greenhouse gas emissions and risks to the Salish Sea.
Read Original -
Indigenous groups given just 2 months to consult on Pacific Link pipeline designation
Source: Global News Politics
Date: 2026-10-01 22:48:12.0
Tags: [National, Alberta, British Columbia, Energy, Resources, Indigenous]The federal government has designated the Alberta-to-West Coast oil pipeline, now called Pacific Link, as a project of national interest under the Building Canada Act to fast-track its approvals. Indigenous communities along the 130-plus-community route were given an extended two-month consultation window ending September 18, 2026, though groups like the Assembly of First Nations and Cold Lake First Nations criticized the timeline and lack of detailed engineering and routing information. Prime Minister Mark Carney aims to begin construction by September 2027 to transport an additional one million barrels per day from the oil sands, while securing environmental safeguards, financing, and equity partnerships with groups such as Fort McKay First Nation.
Read Original -
West coast pipeline is in Canadian national interest: Carney, Smith in Fort McMurray
Source: Alberta - Edmonton Journal (Legislature & Capital)
Date: 2026-10-01 15:13:46.0
Tags: [National, Alberta, British Columbia, Energy, Infrastructure, Economy]Prime Minister Mark Carney and Alberta Premier Danielle Smith jointly announced the designation of the Pacific Link oil pipeline project as a national interest undertaking under the One Canadian Economy Act. The pipeline will run 1 million barrels per day of crude oil from Bruderheim, Alberta, to southern British Columbia, featuring a new delivery terminal and marine export facility. The project will be developed, built, and operated by the federal Crown corporation Trans Mountain Corporation and the provincial Crown corporation Alberta Petroleum Marketing Commission, each holding a 45 percent ownership stake, alongside a 10 percent interest by Pembina Pipeline Corporation. A review process involving the federal major projects office and the Canada Energy Regulator is targeted for completion by September 1 of next year, with construction potentially beginning immediately afterward, contingent on the Pathways carbon capture project offsetting emissions.
Read Original -
West Coast oil pipeline becomes 1st project designated in national interest
Source: CBC Politics
Date: 2026-10-01 15:11:24.0
Tags: [National, Alberta, British Columbia, Infrastructure, Energy, Economy]The federal and Alberta governments have designated a proposed West Coast oil pipeline as the first project under Schedule One of the Building Canada Act. Scheduled to open between 2032 and 2033, the pipeline will transport one million barrels of oil per day from Alberta to the British Columbia coast. Senior government officials project the project will boost Canada's GDP by up to $30 billion annually—including $20 billion directly from the pipeline and $10 billion from diversifying export markets away from the United States—while creating up to 140,000 jobs.
Read Original -
Ottawa faces deadline on whether to fast-track new West Coast pipeline
Source: CBC Politics
Date: 2026-10-01 11:00:00.0
Tags: [National, Alberta, British Columbia, Energy, Infrastructure, Environment]The federal government and the Alberta government face an October 1 deadline to decide whether to designate a new 1,250-kilometre bitumen pipeline project under Bill C-5, the Building Canada Act, to fast-track its approval. The multi-billion dollar project, estimated to cost between $35.2 billion and $43.7 billion, would run from Bruderheim, Alberta, to the Roberts Bank terminal in Delta, British Columbia, carrying more than one million barrels of bitumen per day. The Alberta government and the federally owned Trans Mountain Corporation would each hold a 45 per cent ownership stake, while the Calgary-based Pembina Pipeline Corporation would hold a 10 per cent stake. The project is conditional on the construction of the Pathways carbon storage network and faces opposition and potential hurdles from First Nations groups and environmental organizations over Indigenous consultation and environmental impacts.
Read Original -
West Coast pipeline deadline day: Carney, Smith to make announcement in Fort McMurray
Source: Global News Politics
Date: 2026-10-01 09:00:43.0
Tags: [National, Alberta, British Columbia, Energy, Infrastructure, Resources]Prime Minister Mark Carney and Alberta Premier Danielle Smith announced the official national interest designation deadline and next steps for a proposed West Coast oil pipeline running approximately 1,250 kilometers from Bruderheim, Alberta to Delta, British Columbia. The infrastructure project, estimated to cost between $35.2 billion and $43.7 billion, is advanced through Bill C-39 (the Building Canada Strong Act) and would be owned by Trans Mountain Corporation, the Alberta Petroleum Marketing Commission, and Pembina Pipeline Corporation. Once operational, the pipeline will carry upwards of one million barrels of crude oil per day to international markets, boosting Canada's oil exports by 20 per cent.
Read Original -
Canada’s airports saw record improvements in delays, NAV Canada says
Source: Global News Politics
Date: 2026-09-28 15:26:44.0
Tags: [National, British Columbia, Ontario, Alberta, Quebec, Transportation, Infrastructure, Governance]NAV Canada reported that the number of scheduled flights impacted by delays across Canada's four major airports—Toronto Pearson, Montréal-Trudeau, Calgary, and Vancouver International Airports—fell by 85 per cent from May 1 to Aug. 31, 2026, compared to the same period in 2025. Specifically, delayed flights dropped from 4,996 (1.54 per cent) in 2025 to 769 (0.24 per cent) in 2026, while total flight volume across the four hubs increased by 0.9 per cent to handle 394,919 flights. Vancouver recorded the sharpest improvement with delays dropping from 4.42 per cent to 0.64 per cent, Toronto Pearson had the lowest share of delayed flights at 0.04 per cent, Calgary dropped to 0.05 per cent, and Montréal-Trudeau dropped to 0.28 per cent. Additionally, NAV Canada noted that national air traffic controller staffing shortages narrowed from a deficit of 200 staff in the spring to 170 by August. Concurrently, Prime Minister Mark Carney announced that the federal government is moving ahead with plans to attract private investment in Canada's four largest airports under a model where the federal government retains ownership of underlying land and assets.
Read Original -
Time zones in Canada are getting complicated. These maps lay them out
Source: Territories - Northern Affairs (Yukon, NWT, Nunavut)
Date: 2026-09-18 18:57:22.0
Tags: [National, Manitoba, British Columbia, Alberta, Governance, Transportation]Manitoba has become the latest province to adopt permanent daylight saving time, ending semi-annual clock changes and aligning with recent policy shifts in British Columbia, Alberta, and the Northwest Territories. Yukon abolished clock changes in 2020, and Saskatchewan maintains year-round standard time. This regional patchwork has created unique time zone anomalies, such as a small portion of northwestern Ontario around Kenora falling one hour behind both Thunder Bay and Winnipeg during the winter months, while Ontario's previously enacted legislation to end clock changes remains contingent on matching actions by Quebec and New York.
Read Original