• Summerside won't have battery storage for its solar power this winter after Sunbank fire

    This article is new today!

    Source: Prince Edward Island - Regional News
    Date: 2026-10-30 19:32:11.0
    Tags: [Prince Edward Island, Municipal, Energy, Infrastructure, Environment]

    Following a battery fire at the Sunbank solar farm in September that burned for two weeks, the City of Summerside will enter the winter season lacking 5 megawatts of dispatchable battery storage capacity. Summerside Electric, which generates roughly 60 per cent of its electricity from renewable sources, has secured a conditional firm service agreement with Maritime Electric to help bridge the energy gap, alongside utilizing its 15-megawatt standby generation facility. The city faces ongoing provincial energy challenges tied to mainland transmission infrastructure and submarine cables, prompting long-term considerations for energy independence and grid resiliency.

    Read Original
  • N.S. premier’s office scolds professor over comments on AI data centre

    Source: Nova Scotia - Halifax & Regional News
    Date: 2026-10-28 18:24:41.0
    Tags: [Nova Scotia, Energy, Technology, Infrastructure, Environment]

    The office of Nova Scotia Premier Tim Houston filed a formal complaint against Toronto Metropolitan University associate professor Sibo Chen after he publicly raised validity concerns regarding water usage and electricity rate hikes associated with Everwind Fuels' proposed $10-billion artificial intelligence data centre leased to Anthropic. William Burns, a communications adviser in the premier's office, criticized Chen's remarks as irresponsible and lacking local research, while Chen defended his statements as peer-reviewed analysis concerning the general environmental impacts of large-scale data centres. The controversy centers on the massive infrastructure project, which involves a 20-year lease for the U.S. AI company and has faced public scrutiny over its potential strain on provincial power rates and environmental resources.

    Read Original
  • Provincial Government Opens Public Engagement on New Climate Change Action Plan

    Source: Newfoundland & Labrador - Government Releases
    Date: 2026-10-28 17:30:40.0
    Tags: [Newfoundland and Labrador, Environment, Climate, Energy, Governance]

    The Government of Newfoundland and Labrador, through the Department of Environment, Conservation and Climate Change led by Minister Andrea Barbour, has launched public engagement for its upcoming five-year 2027-2032 Climate Change Action Plan. Hosted on the EngageNL platform, the initiative gathers public and stakeholder input on climate mitigation, adaptation, disaster resilience, environmental awareness, and municipal preparedness to support the province's transition to net-zero emissions by 2050. Written submissions, emails, and online questionnaires will be accepted until November 26, 2026, alongside targeted sessions with Indigenous Governments and Organizations, municipalities, and industry stakeholders.

    Read Original
  • N.W.T. minister says territory has few choices when it comes to ending net metering

    Source: Territories - Northern Affairs (Yukon, NWT, Nunavut)
    Date: 2026-10-28 00:20:19.0
    Tags: [National, Energy, Environment, Governance]

    The Northwest Territories Power Corporation and Naka Power are petitioning the Northwest Territories Public Utilities Board to replace the current net metering system for independent solar power producers with a net billing model. Under the proposed structure, self-generators sending excess power to the grid would receive bill credits instead of a direct 1-to-1 compensation model, a change prompted by territorial government policy directives aimed at addressing projected annual utility net revenue losses estimated between $1.8 million and $2.7 million by 2030. Industry representatives like Mitch Dentinger of N.W.T. Solar Solutions Ltd. argue that the transition will reduce the financial viability of future residential solar installations and diminish environmental benefits.

    Read Original
  • Nova Scotia committee to discuss $10B AI data centre planned for Cape Breton

    Source: Nova Scotia - Halifax & Regional News
    Date: 2026-10-27 12:36:41.0
    Tags: [Nova Scotia, Technology, Energy, Infrastructure, Economy, Environment]

    Nova Scotia’s standing committee on natural resources and economic development is scheduled to discuss EverWind Fuels' controversial $10-billion artificial intelligence data centre project planned for Cape Breton. Announced on October 16, the project features a 20-year lease signed by U.S. artificial intelligence firm Anthropic for an 18,600-square-metre facility in Point Tupper that will draw 95 megawatts of electricity during its initial phase. Opposition parties and legislative witnesses—including Richmond County officials and provincial energy and environment deputy ministers—will examine potential environmental impacts, local water supply strain, and electricity rate implications. Premier Tim Houston’s government maintains that sufficient checks and balances will govern the project and has asserted that household power rates will not increase.

    Read Original
  • Minister to Yukon gov’t corporations: no more coal

    Source: Territories - Northern Affairs (Yukon, NWT, Nunavut)
    Date: 2026-10-26 11:00:00.0
    Tags: [National, Energy, Environment, Mining, Governance]

    Yukon Energy, Mines and Resources Minister Ted Laking issued a directive to the Yukon Energy Corporation and the Yukon Development Corporation prohibiting them from pursuing or considering coal-fired power projects. The directive coincided with an opposition motion brought by NDP MLA Carmen Gustafson, which urged the territorial government to direct the Yukon Utilities Board under section 17 of the Public Utilities Act to reject any applications for energy projects using coal. The political debate was prompted by Vancouver-based Strategic Metals proposing a coal exploration project near Braeburn, Yukon, and evaluating coal-fired power generation despite the federal government's mandate to phase out coal-fired power by 2030.

    Read Original
  • Minister directs Yukon gov’t corporations not to mull over coal-fired power projects

    Source: Territories - Northern Affairs (Yukon, NWT, Nunavut)
    Date: 2026-10-26 11:00:00.0
    Tags: [National, Energy, Environment, Mining, Governance]

    Yukon Energy, Mines and Resources Minister Ted Laking issued a directive instructing the Yukon Development Corporation and the Yukon Energy Corporation to refrain from pursuing or considering coal-fired power generation projects. The ministerial directive coincides with an opposition motion brought by NDP MLA Carmen Gustafson, which urged the territorial government to direct the Yukon Utilities Board under section 17 of the Public Utilities Act to reject any applications for energy projects using coal. The debate highlights ongoing friction surrounding Vancouver-based Strategic Metals' coal exploration project near Braeburn, Yukon, and its potential application for power generation despite federal plans to phase out coal-fired power by 2030.

    Read Original
  • 'Let's do it right': N.W.T. downstream leaders and advocates on Alta. oilsands tailings release

    Source: Territories - Northern Affairs (Yukon, NWT, Nunavut)
    Date: 2026-10-22 17:08:09.0
    Tags: [National, Alberta, Environment, Energy, Resources, Indigenous]

    Indigenous communities, advocacy groups like Alternatives North, and downstream leaders in the Northwest Territories are calling on federal and territorial governments to review Suncor's proposed oilsands tailings release into the Athabasca River system. Critics cite major scientific data gaps, potential health risks to communities dependent on municipal supplies from Lake Athabasca and Great Slave Lake, and the inadequacy of the 2015 N.W.T.-Alberta Bilateral Water Management Agreement. N.W.T. Environment and Climate Change Minister Jay Macdonald stated that the territory opposes the treat-and-release plan until scientific uncertainties are resolved, though primary regulatory authority rests with the federal government and the Alberta Energy Regulator.

    Read Original
  • Some of Canada's top scientists push for changes to Carney's new major projects bill

    Source: CBC Politics
    Date: 2026-10-22 08:00:00.0
    Tags: [National, British Columbia, Environment, Infrastructure, Energy, Governance]

    More than 50 fellows of the Royal Society of Canada published an open letter urging Parliament to make six significant amendments to Bill C-39, the Building Canada Strong Act. The 243-page bill aims to fast-track major energy and infrastructure projects by establishing a one-year review deadline and pre-approved regions of national interest, while amending over a dozen federal laws including those protecting species at risk, fisheries, and water quality. Scientists, including representatives from the University of British Columbia and Queen's University, warn that eliminating the five-year sunset clause from the original Building Canada Act (Bill C-5) and weakening environmental oversight could drive irreversible harm and species extinction, such as the endangered southern resident orca population. Federal ministers, including Dominic LeBlanc, defended the legislation before a special legislative committee, arguing that clearer timelines and robust oversight can coexist.

    Read Original
  • Rally urges New Brunswick government to rethink energy plans

    Source: New Brunswick - Regional News
    Date: 2026-10-20 20:56:59.0
    Tags: [New Brunswick, Energy, Environment, Climate, Infrastructure, Technology]

    Protesters rallied outside the New Brunswick Legislature during the reading of the speech from the throne to oppose government energy and industrial plans, including the proposed Tantramar gas plant, Lorneville data centres, Sisson mine, and the potential re-opening of fracking. Advocates, including the Canadian Association of Physicians for the Environment and the Save Lorneville group, raised concerns over pollution, public health risks, and an increased strain on utility provider NB Power, noting one proposed artificial intelligence data centre would draw 200 megawatts. In response, Premier Susan Holt stated that her government will enforce stringent draft policy conditions requiring projects to demonstrate no negative impacts on water resources or energy rates alongside clear community benefits before receiving approval.

    Read Original
  • ‘Just not acceptable’: Backlash grows over Nova Scotia AI data centre project

    Source: Nova Scotia - Halifax & Regional News
    Date: 2026-10-19 20:13:17.0
    Tags: [Nova Scotia, Municipal, Energy, Infrastructure, Technology, Environment]

    Energy and infrastructure company EverWind announced a $10 billion private investment to build a large-scale data centre campus at its existing Point Tupper site near Port Hawkesbury, Nova Scotia, with AI firm Anthropic signed on as a long-term tenant. The project is planned to begin with an initial 95-megawatt phase in late 2027, scaling up to a full development capacity of 420 megawatts by 2028, and includes a $2 billion investment to advance EverWind's onshore wind energy projects. Opposition parties and community advocates are pushing back, demanding an emergency sitting of the Nova Scotia Legislature due to concerns over public consultation, grid reliability, electricity rates, and water resource impacts.

    Read Original
  • New Brunswick data centre debate highlights cross-country tension over AI facilities

    Source: New Brunswick - Regional News
    Date: 2026-10-19 11:49:46.0
    Tags: [New Brunswick, Energy, Technology, Infrastructure, Environment, Economy]

    New Brunswick Crown-owned electric utility NB Power has received 10 confidential applications from data centre projects requiring up to 900 megawatts of power, sparking cross-country tension and citizen opposition. Notable proposals include a $2 billion artificial intelligence hub by Beacon Data Centers and VoltaGrid featuring a 400-megawatt data centre in Saint John, a $2.7 billion, 375-megawatt proposal by Faster Than Light in Fredericton, and a 50-megawatt campus proposal by U.S. firm Cross River Infrastructure Partners. While the provincial government works on a data centre policy framework to spur economic growth and tax revenue, grassroots groups like Save Lorneville are demanding a moratorium due to environmental and power grid concerns.

    Read Original
  • Fort Simpson, N.W.T., to get new power plant, and off diesel (mostly)

    Source: Territories - Northern Affairs (Yukon, NWT, Nunavut)
    Date: 2026-10-18 10:00:00.0
    Tags: [National, Infrastructure, Energy, Environment, Climate]

    The federal government is contributing more than $31.3 million, paired with approximately $10.4 million from the Northwest Territories Power Corporation (NTPC), to build a new power plant in Fort Simpson, Northwest Territories. The facility is funded through the Arctic Energy Fund and will primarily generate electricity using liquefied natural gas (LNG) to replace an existing flood-vulnerable diesel plant, reducing greenhouse gas emissions and achieving an estimated 10 to 15 per cent in cost savings. Construction is scheduled to begin in spring 2027 and is expected to be completed by 2029-2030, with the new off-island site designed to avoid annual spring breakup erosion and flooding from the Mackenzie River.

    Read Original
  • ‘They shouldn’t be surprised’: Nova Scotians take stand against major data centre project

    Source: Nova Scotia - Halifax & Regional News
    Date: 2026-10-17 19:56:27.0
    Tags: [Nova Scotia, Energy, Technology, Infrastructure, Environment, Economy]

    Energy and infrastructure company EverWind announced a $10 billion private investment to build a major data centre campus at its Point Tupper site in Nova Scotia, which will be leased and operated by AI development company Anthropic. The project is planned to launch with an initial 95-megawatt phase in late 2027, expand by 325 megawatts in 2028, and ultimately reach a 420-megawatt capacity, generating up to 2,000 construction jobs and 215 operational roles. However, local residents and protest organizers have expressed strong opposition due to potential impacts on local water supplies from Landry Lake, energy consumption, and lack of community consultation, prompting plans for further demonstrations.

    Read Original
  • Mattamy Homes taps into sunny Alberta's solar energy

    Source: Alberta - Edmonton Journal (Legislature & Capital)
    Date: 2026-10-16 15:00:03.0
    Tags: [Alberta, Housing, Energy, Environment, Climate]

    Mattamy Homes has integrated standard solar panel systems into more than 1,000 new single-family, duplex, and rear-lane townhomes across Alberta since June 2024, in partnership with trade partners SkyFire Energy and Zeno Renewables. The initiative has saved homeowners an estimated $460,000 annually in energy costs and reduced carbon emissions by approximately 3,200 tonnes per year. Standard offerings include an eight-panel system per home along with triple-pane windows, improved air tightness, and EnerGuide labelling. Additionally, Mattamy Homes has acquired 153 acres in southeast Calgary for the Belvedere community and partnered with Truman for a 253-acre master-planned community in Chestermere, expected to deliver roughly 1,900 homes with construction starting in summer 2028.

    Read Original
  • Nova Scotia to host massive data centre to power Anthropic's AI assistant Claude

    Source: CBC Politics
    Date: 2026-10-16 14:00:00.0
    Tags: [Nova Scotia, Infrastructure, Technology, Energy, Environment, Economy]

    EverWind Fuels is developing a massive 420-megawatt artificial intelligence data centre in Point Tupper, Nova Scotia, designed to power Anthropic's AI assistant Claude under a 20-year lease agreement. The project involves $8 billion in private capital funding for the facility and an additional $2 billion for four planned onshore wind farms to supply renewable energy. The two-stage facility will feature a capacity of 95 megawatts in phase one (online by late 2027) and 325 megawatts in phase two (2028), utilizing a closed-loop water-glycol cooling system drawing an average of 100,000 to 500,000 litres of water per day from Landrie Lake. Additionally, a consortium of Mi’kmaw communities fronted by Membertou First Nation is negotiating a nine per cent equity stake in the project.

    Read Original
  • ‘A show of confidence’: Ottawa invests $100M in Nova Scotia offshore wind

    Source: Nova Scotia - Halifax & Regional News
    Date: 2026-10-15 20:27:39.0
    Tags: [Nova Scotia, National, Energy, Environment, Infrastructure, Resources]

    The federal government, represented by Minister of Energy and Natural Resources Tim Hodgson and Minister of Justice Sean Fraser, announced a $100 million investment to advance the Wind West offshore wind development project in Nova Scotia alongside Premier Tim Houston. The funding will support collecting vital wind, ocean, and seafloor data—with $5 million allocated for wind and ocean measurement tools and nearly $3 million for transmission modelling and marine surveys. The initiative is tied to the Atlantic Energy Strategy, referred to the federal Major Projects Office in September 2025, and aims to support Nova Scotia's goal of licensing up to five gigawatts of offshore wind energy by 2030, with future potential phases generating up to 60 gigawatts.

    Read Original
  • Provincial Government Investing in Marine Low-Carbon Fuels Initiative Through Green Transition Fund

    Source: Newfoundland & Labrador - Government Releases
    Date: 2026-10-15 17:55:28.0
    Tags: [Newfoundland and Labrador, Environment, Climate, Energy, Transportation, Industry]

    The Government of Newfoundland and Labrador, through the Ministry of Jobs, Growth and Rural Development, is investing $365,470 from its $7.75 million Green Transition Fund into the Marine Low-Carbon Fuels Green Transition Initiative. Led by the organization econext, the project will assess, test, and demonstrate renewable fuel options within the province's marine transportation sector. The initiative includes assessing local testing capabilities and carrying out a renewable diesel pilot project aimed at reducing emissions and enhancing industry competitiveness.

    Read Original
  • First Nation in N.S. launches joint venture using sea water to produce jet fuel

    Source: Nova Scotia - Halifax & Regional News
    Date: 2026-10-14 18:08:49.0
    Tags: [Nova Scotia, Indigenous, Technology, Energy, Environment, Economy]

    The Eskasoni First Nation has launched a joint venture called eFuels Mi’kmaq Limited with Sydney, Nova Scotia-based clean technology startup Aeon Blue to produce low-cost eFuels for the aviation and rocket sectors. Eskasoni First Nation is investing $1.5 million into the $4-million pilot-stage project, securing a majority ownership stake. The facility will utilize saltwater electrochemistry to split hydrogen from seawater and capture carbon dioxide from the air to manufacture the fuels, with the project projected to create approximately 80 jobs and provide engineering and management opportunities for community members.

    Read Original
  • Le BAPE publie son rapport sur le projet de réfection du mur de soutènement en amont du barrage Simon ‑ Sicard à Montréal

    Source: Quebec - Fil de presse gouvernemental
    Date: 2026-10-14 11:54:00.0
    Tags: [Quebec, Municipal, Infrastructure, Energy, Environment]

    The Bureau d'audiences publiques sur l'environnement (BAPE) has published its investigation and public hearing report regarding the Phase 2 retaining wall reconstruction project upstream of the Simon-Sicard dam in Montreal, proposed by Hydro-Québec. The report details the environmental review process and public consultations conducted for the infrastructure rehabilitation project on the territory of the City of Montreal. The publication marks a key regulatory milestone in the assessment of the dam safety and structural repair initiative.

    Read Original

Canadian News & Policy Aggregate

AffordabilityAgricultureAlbertaBritish ColumbiaClimateConstitutionConsumer ProtectionCultureDefenceDemocracyDiplomacyEconomyEducationElectionsEmergencyEnergyEnvironmentFinanceFisheriesForeign AffairsGlobal AffairsGovernanceHealthHealthcareHousingImmigrationIndigenousIndustryInfrastructureInternationalJusticeLabourManitobaMiningMunicipalNationalNew BrunswickNewfoundland and LabradorNova ScotiaOntarioPrince Edward IslandPublic SafetyPublic safetyPublicSafetyQuebecResourcesSaskatchewanSeniorsSocial ServicesTaxationTechnologyTourismTradeTransitTransportationWater

Total Articles Processed: 3890

Articles Deemed Relevant: 1590

Made by Spencer Al-Jbouri